Wisconsin Client Outsourced Grab Bag Assembly Case Study
Our Wisconsin client approached Engauge because of labor and space constraints in their facility. Keeping the project in-house resulted in bottlenecks because of how much time the project was taking...
Wisconsin Client Medical Mask Outsourced Assembly Case Study
Our Wisconsin client approached Engauge with a medical-grade product assembly project. Keeping the project in-house resulted in bottlenecks because of the certification and training needed to handle the equipment...
Wisconsin Client Outsourced Packaging Case Study
Within 24 hours of the initial conversation, shipments of product arrived at the Engauge facility. Within 48 hours, the project was fully staffed with finished product being shipped back to the Client. By Day 5, Engauge had exceeded the previous provider’s output, and by Day 8, the backlog was fully cleared...
Wisconsin Client Outsourcing Assembly Case Study
Within 24 hours of the initial conversation, shipments of product arrived at the Engauge facility. Within 48 hours, the project was fully staffed with finished product being shipped back to the Client. By Day 5, Engauge had exceeded the previous provider’s output, and by Day 8, the backlog was fully cleared...